Mechanical installation and adjustment
1. There should be a stabilized base for equipment. When the equipment is installed on the ground or cement, it need not install bottom screw. When the equipment install on steel structure frame, screws should be fixed on the steel structure frame, and the steel structure should have a certain thickness.
2.Before the equipment is shipped from factory, it has installed screen,customers can change screen by yourselives during the using.
3. Before starting, customers should first check degree of fastening bolt and whether mouth position connect with stock receiver. Observe whether vibration motor can move and check whether each layer sieve is fastened.
4. Before the vibration sieve access electrical control panel, firstly, check the electrical control panel. After line connected, observe whether vibration motor rotation direction is clockwise. Wether pperation is normal and there is no noise.
5. Adjusting vibrating motor phase angle to fit all kinds of material screening.
Model | Power (kw) |
Sieve Diameter (mm) |
Granularity (mm) |
Voltage (v) |
RPM (r/min) |
Capacity (kg/h) |
|
DH-400 | 1S | 0.18 | 350 | <10 | 380 | 1440 | 100 |
2S | |||||||
3S | |||||||
DH-600 | 1S | 0.25 | 550 | <10 | 1440 | 500 | |
2S | |||||||
3S | |||||||
DH-800 | 1S | 0.55 | 750 | <10 | 1440 | 800 | |
2S | |||||||
3S | |||||||
DH-1000 | 1S | 0.75 | 920 | <10 | 1440 | 1400 | |
2S | |||||||
3S | |||||||
DH-1200 | 1S | 1.1 | 1120 | <10 | 1440 | 2100 | |
2S | |||||||
3S | |||||||
DH-1500 | 1S | 1.5 | 1420 | <10 | 1440 | 2600 | |
2S | |||||||
3S | |||||||
DH-1800 | 1S | 2.2 | 1720 | <10 | 1440 | 3300 | |
2S | |||||||
3S |